Secto delivered the full scope for this project which included electrical and power design, Equipment Layout and the installation and commissioning on the entire Data POD.

Secto were the main contractor to deliver the entire installation including logistics of the POD, installation of the racks, UPS’s, PDU’s, rack mounted air con units (connected to external condenser units) and all interconnecting AC and DC power cabling taking into consideration generator and battery back up for the POD.

Key takeouts

  • Complete Design
  • Build
  • Install & Commissioning